Designing Brooklyn’s Next Buildings: A Conversation with NA Design Studio

Oct 2, 2026 · Alex Schneider
NA Design Studio won at both the New York and National levels of this year’s AI award with two Brooklyn multifamily projects designed in ArkDesign.AI. We sat down with Alex, who has been with the studio for almost ten years, to talk about the winning designs, how early massing changes the client conversation, and what the team wants to see next in the platform.

The conversation covered a Bay Ridge site that took years to win, a 4th Avenue building now filing with the Department of Buildings, and a client with no architectural training who rebuilt a floor plan from screenshots.

Adam A. Naim, Principal & Alex Schneider, Project Manager at NA Design Studio
Adam A. Naim, Principal & Alex Schneider, Project Manager at NA Design Studio

A Brooklyn studio built through a downturn

Tell us about NA Design Studio.

Adam Naim founded the studio in 2009, right after the 2008 downturn, which hit New York City hard. He worked very hard to bring in clients and to diversify, so the studio could follow whatever the market needed: condos, rentals, or single-family homes.

Most of our work is in Brooklyn. We did single-family homes for a long time and over the last few years we gradually moved away from single-family and toward multifamily residential. Today most of our clients are multifamily developers, and most projects are rentals.

And your own path?

I joined in January 2017, so almost ten years now. Apart from a couple of summer internships, this was my first job out of college. I have grown with the company.

The Bay Ridge project: years in the making

How did the winning project come about?

We had been trying to get this project for two to three years. Adam designed a building for this developer about 15 years ago, and we kept the relationship going, but we had not worked together since. Then they came to us with a big property in Bay Ridge that they had been trying to make work for a long time.

Adam went back and forth with them to make it profitable, zoning-wise and in every other way. When they finally gave us the go-ahead for schematic design, we jumped into Ark.

Adam A. Naim, Principal, Alex Schneider, Project Manager at NA Design Studio, Tzara Peterson – SARA, NY Council President; and Dity Ayalon, AIA, SARA, Founder & CEO at ArkDesign.AI
Adam A. Naim, Principal, Alex Schneider, Project Manager at NA Design Studio; and Tzara Peterson – SARA, NY Council President

Walk us through the design process.

First you lay out the property from the survey and get it as close as possible. The site is mostly straight lines with one angle, which helps you find the right dimensions.

The next challenge is where to put the core. Adam tried many options, including a scissor stair. Because the floor plate is so big, he decided early on that egress required two separate stairs, with the elevators more central. In Ark it is easy to drag and drop a whole core and work around it.

As you go up, the bulk of the building steps back. There is an amenity sky lounge on the eighth and ninth floors with a roof terrace looking toward the Verrazzano Bridge.

Adam did most of the work in Ark. He would call me over to confirm decisions and talk through different approaches. I handled the renderings afterward.

Keeping the first meeting on what matters

How does this kind of schematic change your client meetings?

It really narrows the conversation to what the client needs to see most. If we show too much detail on day one, like a full unit layout, they start dissecting where the bathroom and kitchen go. That is not productive early in a project.

With a schematic like this, the meeting is efficient. The color-coded units make it easy to see where the one-, two- and three-bedrooms are, which units get the best views, which get roof terraces, and where the amenity space sits.

It also gives us a base 3D massing. Early on, we want the client to understand that we are working with form and bulk, showing what their building could be size-wise. The finished renderings can come later, sometimes at the end of that first meeting, sometimes in a later one.

From massing to rendering

How did you produce the renderings?

We take the 3D massing from Ark into other tools, like Gemini, together with projects we have designed before. We ask it to apply the same or a similar style to the massing, then go through several iterations until we get something we really like. We also blur the background and work to make it feel as close as possible to the Brooklyn context.

It looks easy, but it takes a lot of iterations. These took a few hours.

The style we used came from an earlier design of ours that the client chose not to pursue. It never got built, but it always stayed with us. Now we are seeing if we can bring it to life here.

4th Avenue: the client who rebuilt the plan himself

Your New York winner is on 4th Avenue in Brooklyn. What happened there?

The client was a group, including two brothers who work together. We met with them and showed them our rendering and screenshots of the Ark floor plans. We emailed the images but did not share the Ark file.

One of them is very tech-savvy. He figured out from the images that they were made in ArkDesign.AI, signed up, and recreated the plan from the screenshots on his own. He is not an architect and has no training, and nobody onboarded him.

What did he do with it?

He mostly played with where the cores go and how that affects the units. Our original version had two stairs. Working through his ideas, we ended up with a scissor stair and two elevators. He came up with ideas he thought would work even better for what they were looking for, and we refined it from there.

It will not work with every client. Not all of them want to do the work or have the time, and that is what they hire us for. But every now and then you get one who wants to dive in, and it is great.

Where does the project stand now?

They are in the middle of filing with the Department of Buildings. Our first building on 4th Avenue was our flagship project for a long time, and it has helped us win a lot of work since.

Where Ark fits in the workflow

How do you move from Ark to construction documents?

Lately we try to get the client’s approval on the Ark version first: the unit layout, the number of units, the core locations and the overall bulk. Once they sign off, we bring it into AutoCAD and make it precise against the survey. Sometimes a corner turns out to be 91 degrees instead of 90, and wall thicknesses get detailed.

After that, we try not to change the big moves. Iterations in CAD are mostly inside the units: bedrooms, kitchens, bathrooms.

How often do you use it?

We want it to be the beginning of every project. We average roughly one new project every four to six weeks, and each time we spend a week or two in Ark until we get approval.

Zoning analyses come in more often. Adam still does those on paper and in numbers: floor area, number of floors, number of units. Out of a handful, maybe one becomes a project. Once it does, we go into Ark.

What has the tool done best for you?

It lets you create iterations very quickly. You bring an idea from your mind to paper, test it, and go back and forth.

What NA Design Studio wants next

What would make the platform better for you?

The floor area and deductions breakdown per floor. It got better in the latest version, but it can go further.

Take corridors. There is a corridor on every floor, but it is not always deductible. Under current New York rules, it depends on whether the corridor has a window and how far it runs from the elevator: under 100 feet, or ending at a three-bedroom unit. If Ark pulled the corridor area in automatically, with a checkbox for 0%, 50% or 100% deductible, we could get to net floor area much faster.

Our finished breakdowns go floor by floor and use by use, commercial and residential. They start from gross floor area, apply every deduction available for each floor, and end with net floor area per use, plus a unit matrix. If Ark carried the numbers from the floor plans into a table like that and let us check off which deductions apply, we would get bottom-line numbers faster and more accurately.

Reading the Brooklyn market

How busy is the market right now?

Busy, but not as busy as a year ago. Almost two years ago the city introduced City of Yes zoning, which allows larger buildings. For about six months before it passed, everyone waited. When it landed, around the same time as a tax incentive for affordable housing, projects poured in. That was late 2024 into early 2025.

We had several projects through 2025, and 2026 has been slower. It went down, shot straight up, and has now leveled out. We are a small company, so that is our view, not the whole picture.

Condos or rentals?

In Brooklyn, mostly rentals right now, especially for developers who want to build quickly and move on to the next building. The Bay Ridge project started as all condo, then went half condo, half rental, and ended up all rental as the market shifted. We still see clients who want condos to offer something a neighborhood does not have.

What comes next

The Bay Ridge project is underway and the 4th Avenue building is moving through DOB filing. Adam returns from the holidays soon, and we look forward to hearing his feedback as the hands-on user behind both projects.

Congratulations to Adam, Alex and the NA Design Studio team. See more of their work at nadesignstudio.com, and join us at the award celebration at Hotel Marcel in New Haven.


Start creating optimized floor plans fast & efficiently with ARK

Submit a project

Submit Projects that you have designed to our gallery.

Samuel Wieder Architects

A mixed-use residential project with a gross area of 67,431 square feet, spanning 11 floors and comprising a total of 104 apartments.

Perkins Eastman

A mixed-use residential project with a gross area of 146,128.4 square feet, spanning 28 floors and comprising a total of 231 apartments.

ND Architecture & Design

A mixed-use residential project with a gross area of 90,911.7 square feet, spanning 13 floors and comprising a total of 131 apartments.

Ask a Question

Become Certified

If you have mastered ARK and have created a few projects on our platform, you too can become ARK Certified and feature on our website!

Submit an article

Submit an article to be published on ArkDesign.AI blog.

Submit a project

Submit Projects that you have designed to our gallery.

Upgrade to Pro

Please fill in your details and we will get back to you with all the details

Get a demo

Please fill in your details and we will get back to you shortly.